


Rotterdam tidal surge gate
Fabricated and positioned four 620-tonne post-tensioned precast caissons. Acoustic soundings verified zero foundation deflection during subsequent seasonal storm tests.
Commercial fleet refits
Comprehensive structural overhauls on 140-meter offshore supply vessels in Graving Dock 4, covering plate renewals, rudder alignments, and shaft seal replacements.
Berth 42 quay extension
Constructed a 380-meter deep-water container quay with bored steel tubular piles and high-capacity bollards, delivering an operating depth of 16.5 meters LAT under extreme tidal variations.






Field records by discipline
Archival documentation of coastal breakwaters, heavy lock structures, subsea foundation soundings, and municipal terminal refurbishments.
Harbour authority performance
Tide & Pylon completed the quay deepening within millimeter tolerances without halting round-the-clock container handling on adjacent berths.
Chief Harbour Engineer, North Sea Port Authority
Their hydrographic data matched physical core samples perfectly. The caisson seating process proceeded without unexpected seabed preparation downtime.
Director of Infrastructure, Atlantic Gateway Terminal
The dry dock engineering reports met every standard required by Lloyd's Register surveyors during our fleet refit programme.
Fleet Technical Superintendent, Celtic Marine Transport
Receive complete bathymetric datasets, pile-driving logs, concrete mix certifications, and structural drawings for pre-qualification assessments.
